How to run a pre-mortem on a Jira issue

A pre-mortem is the opposite of a post-mortem: you assume the work has already failed and ask why, before anyone writes code. The technique comes from Gary Klein, and it works because imagining a failure that has already happened is much easier for people than rating hypothetical probabilities.

This page is how to do it on a Jira issue. The manual version takes fifteen minutes and needs no tooling; the last section is what our app does with it.


The manual version, in fifteen minutes

Do it at the point where the approach is decided but no code exists — grooming, or the first day of the ticket.

1. State the failure as fact. Not “what could go wrong”, which gets you platitudes. Say: “It is three weeks from now. This shipped and it went badly. What happened?”

2. Everyone writes alone for two minutes. Silent and independent, before anyone speaks. The first answer said out loud anchors the room, and the quietest person in the room is usually the one who has seen this fail before.

3. Read them out, one each, round the table until the lists are empty. No discussion while reading — discussion is what makes people drop their weaker item, and the weaker item is often the real one.

4. For each risk that survives, write three things. A risk with none of these is a worry, not a risk:

   
Mitigation What we do now so it does not happen
Contingency What we do if it happens anyway
Trigger The observable signal that it is happening — a log line, a metric, a support theme

5. Put them in the issue, not in the meeting notes. A risk in a document nobody opens again has not been recorded. Three lines at the bottom of the issue description is enough, and it is where the person doing the work will actually see it.

The four questions that produce most of the real risks

If the room is quiet, these work better than a generic prompt:

Why most pre-mortems stop after three sprints

They are a meeting, and meetings lose to delivery pressure. The two failures we see most:

Where Premortem fits

Premortem does step 1 to 4 on an issue in a few seconds, so the fifteen-minute meeting becomes a five-minute review of a list someone else drafted. It reads the issue, its epic, the decisions in the comments and your architecture page, and it names risks with the mitigation, contingency and trigger already filled in. You accept the ones that are real; those go into the issue description and, if you want, a Confluence risk register. The rest disappear.

The part it does that a meeting usually cannot: if you import your closed incidents, the risks cite them by key — “this is how PAY-482 started” — which is the fourth question above, answered without needing the person who was there.

It is honest about what it is: we published a measurement of it against six open-source changes whose later regressions are recorded in public trackers. Two hits, two near misses, two misses. It is a drafting tool for the people in the room, not a replacement for them.